    Decoration strategy| How to install PVC panel?

    Editor:Haining Haowang Group Co.,Ltd. │ Release Time:2022-10-12 

    PVC Ceiling Panel, also known as overhead guard, which plays a very important role in home decoration. Not only can play a beautiful role, but also has the characteristics of moisturizing, sound absorption, heat insulation and so on. It is also the shelter of  the chandelier and bath heater wires, so almost every space will be installed with a ceiling, and the most popular one is the PVC plastic panel ceiling. So how to install PVC plastic panel ceiling ? What are the installation steps of plastic panel ceiling ? Let 's take a look together.

    PVC panel

    Installation process

    Elevation of elastic line → installation of main keel → installation of boom → installation of side keel → installation of plastic gusset plate → cleaning site.

    pvc ceiling panel

    Installation steps

    1. To install a pvc plastic panel ceiling, the first step is to determine the location of the ceiling, that is, the height of the ceiling. Usually the ceiling should not be too low, the height will make the space appear depressing. After determining the installation height, use the ink line to play the elevation on the surrounding wall, and the reference line should be clearly marked .

    2. Determine the size and specification of the plastic gusset according to the ceiling design and ceiling area .

    3. Determine the keel position line. Because the keel is mainly used to support the shape and fixation of the outer decorative material, in order to ensure the integrity of the installation, the structural size and position line of the keel are determined according to the panel specifications, and the size of the plastic gusset has been determined. The position line is marked above the reference line .

    4. Main keel installation. The distance between the main keel hanging points should be selected according to the design recommended series. The middle part should be arched, and the keel arching height should not be less than 1/200 of the room surface span. Correct the position and height in time after the main keel is installed. Pull out the vertical and horizontal elevation control lines, start from one end, and adjust the suspension height of the boom while installing to control the leveling of the dragon skeleton. After the large surface is flat, adjust some single keels with curved edges until the flatness meets the requirements. When installing the main keel, also pay attention to leave the exit of the lighting line .

    5.Install the boom. The installation of the boom should meet several requirements: first, the boom should be straight and have sufficient bearing capacity ; secondly, the boom should be rust-proofed in advance; the boom should not exceed 300mm from the end of the main keel, otherwise the boom should be added. , If you need to add a boom, it is best to lap and weld firmly to avoid the main keel from falling .

    6.Side keel installation. The side joists should be installed snugly against the main joists. After installing the main and side keels, check the flatness and firmness of the keels .

    7.Plastic gusset installation. Fasten the plastic gusset on the keel in parallel by one strip, and connect it with a special connector. It should be noted that when installing the last board, it should be cut with a cutter according to the final actual size, the panel should be slightly bent and installed, and finally sealed with pressure strips on both sides.

    Installation Precautions

    1. After the wall tiles of the kitchen and bathroom are posted, you can notify the gusset manufacturer to come and measure.

    2.The electric water heater and the gas water heater are installed in place. And the power lines for lighting, exhaust, etc. should be reserved.

    3.Before installing the ceiling, buy the bath heater exhaust fan (not required for the integrated ceiling), and get it to the site. The opening position of the exhaust hood smoke pipe is determined with the cabinet manufacturer.

    4.Ceiling lamps, if they are embedded, should be bought and brought to the scene, ordinary ones are not needed.

    5.Please confirm the installation position of the above electrical appliances so that the installation workers can open the holes.

    6.Now most of the windows of the balcony kitchen and bathroom are lower than the size of the ceiling. Please prepare a wood board (or kitchen cabinet board) so that the ceiling installer can seal these parts.


    主站蜘蛛池模板: 中文字幕国内一区二区| 三年片大全免费观看| 国产极品粉嫩馒头一线天| 久久欧美与黑人双交男男| 色av永久无码影院av| 亚洲精品卡2卡3卡4卡5卡区| 日韩精品一二三黄色一级| 国产成人精品亚洲午夜麻豆| 国产成人啪视频一区二区三区| 欧美亚洲国产日韩一区二区三区| 欧美熟妇zozozo| 男人的天堂av网站| 亚洲国产综合精品2020| A级国产片在线观看| 日韩av一区在线播放| 香港三级日本三级韩国三级| 国产69精品久久久久9999不卡| 日韩视频免费| 亚洲人成人网站18禁| 久久成人影院精品777| 精品国偷自产在线| 91中文字幕在线观看| 亚洲一区二区三区 日韩| 国产偷国产偷亚洲高清午夜 | 激情午夜婷婷| 日本一区二区最新在线观看 | 99人妻碰碰碰久久久久禁片| 国产午夜精品免费一区二区三区| 久在线精品视频线观看| 亚洲欧洲日韩国产综合在线二区 | 白丝乳交内射一二三区| 亚洲一区二区在线视频中文字幕 | 中国老熟女人hd| 亚洲日韩欧美一区二区三区| 国产在线欧美一区二区| 亚洲愉拍一区二区精品| 日韩人妻精品无码一区二区三区| 国产亚洲曝欧美精品手机在线| 天堂网www在线资源网| 男人添女人下部高潮全视频| 大地资源网最新在线播放 |